Customization: | Available |
---|---|
Object: | Asphalt Concrete Pavement |
Moving Type: | Mobile |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
XCMG Official XM1005K Road Building Machine 1m Second Hand Asphalt Cold Milling Machine
XM1005K milling machine is a kind of high performance one-meter milling machine, mainly used for excavation and renovation of asphalt concrete pavements of highways, urbanroads, airports, freight yards, parking lots, etc. It can efficiently remove road congestion, waves, mesh patterns, ruts, etc.; excavate the pavement pits and trenches; roughen the cement pavement and mill the surface faulting.
This machine has high work efficiency, high level of intelligence, long working cycle, and good maneuverability, reliability and maintenance, and the overall technical performance has reached the international advanced level.
Advantages and highlights:
1.Offer Test Report of Professional Institute.
2.Details Of Maintenance And Repair Items Included.
3.Price Concessions.
4.Official Factory Sourcing.
5.Reconditioning Directly From XCMG.
6.Vehicle Condition of Perfection.
7.XCMG Official Endorsement.
8.SGS Provides The Third-Party Inspection Certificate.
Item | Unit | Parameter |
Milling width | mm | 1000 |
Milling depth | mm | 220 |
Rated power | kW/rpm | 164 |
Displacement | L | 6.7 |
Full-load fuel consumption | L/h | 47 |
Fuel tank | L | 500 |
Hydraulic oil tank | L | 120 |
Water tank | L | 850 |
Working speed | m/min | 0-50 |
Traveling speed | km/h | 0-8.5 |
Theoretic gradeability | % | 57 |
Ground clearance | mm | 205 |
Weight in transportation state | kg | 12800 |
Theoretic conveying capacity | m³/h | 92 |
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted.
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC.
3: What about the delivery time?
A: 7-30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.