Customization: | Available |
---|---|
Certification: | GS, RoHS, CE, ISO9001 |
Condition: | Used |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
XCMG Manufacturer 130 Ton Big Crane Machinery with Parts QY130K China Crane Machine
Lifting performance and driving performance are improved in an all-round way, and the overall lifting performance is 12% higher than the industry's highest level.
Low-speed and high-torque power system reduces fuel consumption by 12% and increases climbing capacity by 12%.
The average fuel consumption of the comprehensive working condition is reduced by 10%, and the smoothness and fretting performance are increased by 15%.
The industry's first crane intelligent boom technology, to achieve car-level Xugong machine interaction system, to provide users with a comfortable intelligent operation experience.
The new generation of appearance, humanized design, user operation is more comfortable and convenient.
Category
|
Item
|
Unit
|
Parameter
|
|
Main Performance Parameters
|
Maximum rated lifting weight
|
t
|
130
|
|
Maximum lifting moment
|
Basic boom
|
kN.m
|
5116
|
|
Outrigger distance
|
Longitudinal
|
m
|
7.7
|
|
Transverse
|
m
|
7.9
|
||
Length of lifting boom
|
Basic boom
|
m
|
13.1
|
|
Fully extended main boom
|
m
|
61
|
||
Fully extended main boom + jib
|
m
|
89
|
||
Jib installation angle
|
°
|
0/15/30
|
||
Working Speed Parameters
|
Rising time of main boom
|
s
|
65
|
|
Full extending time of main boom
|
s
|
460
|
||
Turning speed
|
r/min
|
2
|
||
Lifting speed (single rope, 4th floor)
|
Main lifting mechanism
|
m/min
|
135
|
|
Auxiliary lifting mechanism
|
m/min
|
135Company Informatio
|
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted.
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC.
3: What about the delivery time?
A: 7-30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.