Customization: | Available |
---|---|
Warranty: | 1 Year |
Cab Location: | Adjustable |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
XCMG Official Forklift Diesel 3 Ton China Mini Forklift Truck
XCMG Diesel Forklift provide you with multiple choice as per your real need,we have different reliable engines for choice. All these engine have been tested that they can be trusted through all kinds of tough working condition and get recognition from millions of client across the worldwide.
These engines are specifically designed for the forklift use,with low fuel consumption,less noise and vibration,all these features improve the whole performance of the forklift.
High efficiency is also delivered through the performance of the axles,the excellent brake system make sure the forklift operate with safety,the steering axle provide prompt and precise feedback to the driver when steering.
Model
|
FD30T
|
Power Type
|
Diesel
|
Rated Load Capacity
|
3000kg
|
Load Centre
|
500mm
|
Rated Lift Height
|
3000mm
|
Free Lift Height
|
100mm
|
Fork Size (L×W×T)
|
1070×125×45mm
|
Mast Tilt Angle (F/R, α°/β°)
|
6°/12°
|
Fork Overhang (Wheel Center to Fork Face)
|
484mm
|
Rear Overhang
|
595mm
|
Ground Clearance (Bottom of Mast)
|
145mm
|
Length to Face of Fork (Without Fork)
|
2773mm
|
Overall Width
|
1225mm
|
Overhead Guard Height
|
2235mm
|
Turning Radius (Outside)
|
2450mm
|
Travel Speed (No Load)
|
19km/h
|
Lifting Speed (Full Load)
|
430mm/sec
|
Lowering Speed (Full Load)
|
450mm/sec
|
Max.Gradeability (Full Load)
|
20%
|
Tyre (Front x 2)
|
28×9-15-12PR mm
|
Tyre (Rear x 2)
|
6.50-10-10PR mm
|
Total Weight
|
4340kg
|
Battery
|
12/90V/Ah
|
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted.
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC.
3: What about the delivery time?
A: 7-30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.